Quick forecasts: spares, labour hours and costs
Before you start: How often the work is done, or a life model of the part (a saved non-repairable model, or its distribution and parameters) and roughly how old the units are. Both if you have them.
Decisions › Forecasts has one quick forecast tool with three answers:
- Spares forecast: how many spares the units will use, and how many to hold.
- Hours forecast: the maintenance hours they will need.
- Cost forecast: what they will cost to maintain.
It's a scratch pad: nothing is saved. Fill in the inputs and press Calculate (bottom right of the inputs, or Enter in any field). The three views share the same inputs and the same answer, so you can switch between Spares, Labour hours and Costs at the top without typing anything twice or calculating again. Change an input after an answer and it says Inputs changed: Calculate again; the answer stays until you do.
If something is missing when you press Calculate, it says what beside the field and goes there: "Enter how old it is now", "Pick the unit of its age and its life".
For a forecast you keep, with each item named and its own usage, use Fleet forecasts instead.
Fill in the inputs
At the top: Units, Running (all the time, so many hours a day, or so many hours a week) and the Horizon. Then add one or both of these sections (each has Add and Remove at its right):
- Work on a schedule: what the work is, how often (every so many hours, days, weeks, months or years) and what it needs each time. No model is needed. Its count comes from the schedule, so it's certain: no range, no chance involved. It's assumed just done at the start. Work by hours goes through the running hours; work on the calendar counts on dates whatever the running.
- A part that fails: its life, Saved model (it brings its own unit) or Type parameters (the distribution, its parameters such as Scale α and Shape β, and the Unit, hours unless you pick another: days, weeks, months, years, cycles, starts, km, miles or operations); its Age now, in the same unit; and what a failure needs (if it fails). Its failures are a chance, so they come with a likely range. They're worked out (exact arithmetic, the same as a forecast opened from the Explorer), not simulated; only a list of more than 60 different ages is simulated, and the answer says so.
Each view asks only its own extra: on Labour hours, the hours each time and the hours if it fails; on Costs, the cost each time and the cost if it fails; on Spares, how many of which spare each time (a failure uses a like part). A value typed in one view is kept in the others.
With both filled in, say what the work does to the part: it doesn't change the part's life (an oil change, a test), or it replaces the part (a planned replacement at that age, so the failures left are those before it). When the part is replaced (under More options) is Restart its schedule by default (age replacement: a failure restarts its clock, so the planned count is a chance) or Keep its schedule (block replacement: on its dates, failures or not). Work that doesn't change the part's life and restarts when it's replaced shows its scheduled count with a note on how many fewer replacements may make it.
More options, at the bottom, holds the rest: a different age for each unit, the cost of a spare (added to each failure and replacement), and the other views' figures. A life in cycles or kilometres asks how many a unit adds a day, beside its age.
Read the answer
Each view leads with one sentence, for example 12 times in the next 12 months: 2.4 h for work alone, or 64% chance it fails in the next 12 months: $124,000 expected for one part with less than one failure expected. Then:
- The lines: one row for each owner, the work and the part's failures, with how many times, the view's figure and the kind of number: certain (from a schedule), worked out (exact arithmetic) or simulated (from many seeded runs, the same every time).
- Ranges are 90% two-sided: in nine years out of ten the number falls inside it. A certain line has none; in a total it's added to both ends of the range. "90% chance of no failure before month 2" is 90% one-sided, the lower bound on life.
- Not counted: anything a figure leaves out because it wasn't given (no cost if it fails, no hours each time). The total then says it's the known total. Nothing is guessed.
The chart shows each period with its likely range as whiskers, and By month gives the same numbers in a table. Export CSV saves them. On Spares, When next gives the period by which each of the first spares is likely used, and Spares: how many to hold takes the part's lead time and your service level.
Supporting work: what if it isn't done?
Choose keeps the part on its life (supporting) for work like greasing or an oil change, and say what not doing it does: If it isn't done: failure rate × 2 (twice as likely to fail in any hour while it isn't done). The answer then gives its Worth: the failures (and their cost) it avoids in the horizon, for its own cost. That's a comparison of two forecasts, so it's added to no total; the work's cost stays on the work, the failures on the part.
What if it's stretched to a longer interval, or not done, shows the answer with that change beside the plan: not done, the failure rate × 2 the whole time; stretched from every 250 h to every 500 h, it's overdue half the time, so the failure rate is × 1.5 on average. A shorter interval than the one the life assumes has no modelled benefit, and says so. When the interval is more than a fifth of the part's mean life, the averaged rate is a rough guide and the answer says Approximate. Grace (under More options) is how far overdue it may run before the impact starts. Several supporting tasks on one part multiply. Nothing is saved.
Start from the Explorer
On the Explorer's Maintenance tab, a position, a task or a work package has Open in › in its menu: Optimise, Spares forecast, Hours forecast and Cost forecast. Each opens the tool on that row and everything below it, with a line naming where it came from and a link back. There is no form: the records are the inputs, and the answer is set out by owner:
- Each task has its own line: how many times it falls due in the horizon (from its schedule, so certain), its labour hours and its cost each time. A task in a package is counted once, through the package; a package's visit cost (call-out, set-up) is its own line.
- Each failure mode with a life model has its line: the failures expected with the plan in place and their likely range (worked out). Under it, the corrective line (after a failure: its hours, spares and cost from the failure mode's response if it fails; a cost of a failure typed on the mode overrides the response's cost, and the position class's figure is used when neither is there) and, when a check with a P-F interval finds some in time, the follow-on line (found at an inspection: its hours, spares and cost from the failure mode's follow-on task, Follow-on: when found, on the Maintenance tab). The same failure mode on several positions at the same cost is one owner.
- Supporting tasks: what if lists each supporting task with an impact, its Worth (the failures it avoids in the horizon, for its cost), and a what-if: stretch it or mark it not done to see the forecast With your changes in a column beside the plan as recorded. Nothing is written. A supporting task whose own interval is already longer than the one its life assumes counts its impact in the plan as recorded too.
- A supporting task (greasing, an oil change) reads Keeps it on its life: the life model already assumes it, so it changes no failure while it's done as planned. An assumed impact carries an Assumed chip.
- The total is the sum of the lines, each counted once, with its 90% two-sided range; on Costs it splits into planned, follow-on and corrective.
Not counted lists every gap with a link to where it's fixed: a failure mode with no cost of a failure (its failures are still counted, their cost isn't), a check with no P-F interval (its finds aren't counted, so every failure goes to the corrective line), a fitted position with no life model, a task that can't be put on dates, a task with no cost or no labour, and a failure mode with no response if it fails (Add opens the form for it on the Maintenance tab), and one whose finds have nothing recorded for them (Add opens the form for a follow-on there). A total with a gap says it's the known total; nothing is guessed.
The horizon is from today, 12 months unless you choose 2, 3 or 5 years. The running hours come from the position's duty, else the rate of its hours readings, else 24 hours a day, and the line under the title says which. By month gives the tasks, labour hours, planned cost, failures and unplanned cost for each month. Nothing is written back to the Explorer.
Open in › Optimise opens Optimal replacement with the task's model and costs filled in, to try other intervals. To change a task's interval, use Optimise… on the task itself.